Background
Leeds Teaching Hospitals NHS Trust is building a new pathology laboratory in the grounds of St James’s University Hospital to improve healthcare services across hospitals in Leeds and the wider region.
Scope of services
We conducted a preliminary ecological assessment (PEA) survey in 2020 to provide a detailed assessment of habitats on the site and to summarise the ecological baseline. The site included two disused buildings, several small areas of lawn, planted shrubs and several semi-mature trees. Following the PEA, we provided guidance on how the scheme design could achieve biodiversity gains in line with local goals for biodiversity. This involved producing
- a BREEAM New Construction 2018 assessment of land use and ecology credits
- a five-year landscape management plan to meet the BREEAM assessment category LE0 (site selection)
- a biodiversity net gain assessment using the Defra 2.0 metric.
The site was identified as having low ecological value, as it was dominated by amenity grassland and hard infrastructure with no protected species. RSK Biocensus provided recommendations to improve biodiversity on-site, such as planting a range of native and wildlife-friendly plant species to provide food for birds and insects, including integrated bat boxes in the development to provide roosting opportunities for local pipistrelle bats, deploying bird nest boxes for sparrows and swifts within the building structure and creating habitats for invertebrates. Our proposals corresponded to an award of five credits under LE04 (Ecological Change and Enhancement) of the BREEAM scheme and a 14.9% net gain in ecological value for the site.
Impact
We supported the client in designing a new pathology laboratory with an ‘Excellent’ rating for a BREEAM New Construction 2018 assessment.